Turn on a layer above · click a ward to open it
Click a ward on the map.
Ward H/E can fix all 7 risky roads (₹78,500) and still have ₹33.7 lakh spare.
Fixes 7 of 7 roads.
Average cost ÷ share of jobs that did not fail within 30 days.
| ✓ Cold mix patch | 32% fail | ₹18,470 |
| Hot mix patch | 23% fail | ₹21,733 |
| Mastic asphalt | 26% fail | ₹39,353 |
| ✓ Dewatering pump deployed | 14% fail | ₹74,906 |
| Drain desilting | 26% fail | ₹1.3 lakh |
| Pump + debris removal | 22% fail | ₹1.5 lakh |
Cold mix is cheapest per lasting pothole fix, but fails more often. On ambulance, flood-prone and busy roads a failure costs more than money, so the plan uses the most durable method.
Most room: L (+₹42.7 lakh), F/N (+₹37.1 lakh), H/E (+₹33.7 lakh).